Kongstruction Update: Skull Island’s Temple Gate Facade Comes Together

P1020053The huge facade on the front-side of the building at the site of Project 340 in Islands of Adventure is starting to really resemble the temple gate from the King Kong films as construction continues. In addition to the facade work, walls have started to go up around the indoor queue section near the right side of the structure. See the construction photos from today below to catch up on the progress.

Here's a comparison of the current structure to a still from the 2005 King Kong film:

king-kong-skull-island-islands-of-adventure-comparison

Construction Update Photos:

The construction zone as seen from Toon Lagoon side.
The construction zone as seen from Toon Lagoon side.
Workers building the gate structure
Workers building the gate structure
Wire mesh added to skeleton, in preparation for preformed wire-frame which should be arriving soon to create underlying rockwork base.
Wire mesh added to skeleton, in preparation for preformed wire-frame which should be arriving soon to create underlying rockwork base.

P1020061

P1020063

More supports to be put up next
More supports to be put up next, on right of photo
Walls starting to enclose indoor queue area
Walls starting to enclose indoor queue area, seen on the left of image
Walkway frame on the right, most likely to become exit path
Walkway frame on the right, most likely to become exit path
At City Walk, they replaced the Universal Orlando sign with a new version. The blue looks good, really pops.
At City Walk, they replaced the Universal Orlando sign with a new version. The blue looks good, really pops.

That's all for this Kongstruction update. View the previous update.

See all the updates here and subscribe to the feed for more continual updates!