Tag Archives: lights

The work walls have come down in front of the entrance to Race Through New York Starring Jimmy Fallon at Universal Studios Florida. We're one step closer to seeing this soft open! Construction is continuing inside the entrance and queue, but there's been plenty of ride testing going on and a private event was held at the ride earlier in the week. We'll keep you posted on when the general public may have their first chance to experience this new attraction, so stay tuned!

Plus, we're taking a look at the nighttime lighting for the new ride as well as some minor changes in the store. The last few nights have seen the marquee entrance sign all lit up as well as windows and accent lights on in the building. Check out the video and photo update below and stay tuned for more #FallonRide updates coming soon!

...continue reading

P1070744The Incredible Hulk Coaster at Universal's Islands of Adventure has been completely rebuilt from the ground up and it's looking like it's just about ready to re-open! Spectacular lighting effects and new roar sound effects have been added since my last visit, as well as some smaller details throughout the area. Everything looks truly incredible at night and I cannot wait to ride it with the new launch effects, sounds, and music! As I was leaving last night they were taking down the construction walls, so hopefully that means a soft opening is not too far away. See today's video and photographs below and stay tuned for more Hulk updates coming soon!


...continue reading

Hulk-Full-Reveal-featured-image-900x563"A new story. A new ride vehicle. A new queue experience. A new entrance. The only things you’ll recognize when The Incredible Hulk Coaster at Universal’s Islands of Adventure re-opens in late summer are the world-famous twists and turns of the ride track." These are the things Universal is touting about the completely overhauled Hulk Coaster, which has been closed for refurbishment for nine months now. The newly updated ride will feature an incredible new entrance with a full-size statue of Hulk (no more 2D wooden cutout) and he'll be holding up a large section of track. The track pieces were salvaged from the original ride, which is a great piece of trivia for a nerd like me. The newly designed ride vehicles will feature on-board audio, as has been rumored, featuring a new musical score by Patrick Stump, front man of Fall Out Boy. There's going to be a new storyline and fully redesigned queue as well. See the video, concept art, and full description of all the great changes coming below and stay tuned for more construction updates coming soon!


...continue reading

00527.MTS.Still001The walls around the food stand have been moved back and "The Mess Tent" is now open and serving guests. It's now just a matter of weeks, or maybe even days, before all the walls come down around Skull Island: Reign of Kong at Universal's Islands of Adventure. I think the most exciting thing I saw today wasn't even something you can see... It was the beautiful original score for Skull Island now being pumped into the area. (You can listen to a sample here, or in the video below.) See the video as well as images below to get a better look at The Mess Tent, some more little touches that have been added, and listen to the new area music.

00527.MTS.Still004Opening date? The media preview for Skull Island, along with the new Sapphire Falls hotel, is scheduled for June 22-24. I'm assuming the grand opening will be around this time. Usually soft opens happen in the weeks leading up to a new attraction's grand opening. Soft openings, or technical rehearsals as it's called by Universal, allow team members to get used to operating the ride during a practice period. During this time some effects may not be running as problems are fixed throughout testing. Soft opens may only happen for a couple hours a day at first. They will last longer as we get closer to the official opening date until eventually it is open all day. Check back here and I will be posting when soft opens have started. It could begin any time from now until the end of June. Stay tuned!


...continue reading

00409.MTS.Still037The non-stop construction continues for the new multi-sensory ride, Skull Island: Reign of Kong, opening soon at Islands of Adventure. Today I got my first glimpse of vehicle testing and got a chance to see what else is being worked on at the site. The food stand, named "The Mess Tent", is nearly ready to start serving guests. It already has all the equipment and warmers it needs to offer snacks like soft pretzels, churros, and cold drinks. And now they're decorating it with nets, ropes, and other decor to better match the area. New exterior lighting has appeared, mainly pointing at the temple gates and surrounding area. Much of the lighting has a blue tint to create the perfect nighttime mood after dark. I also saw folks painting and set-dressing the area near the entrance, adding accents to bamboo spears and painting. Check out the video and snapshots below and stay tuned for more updates!


...continue reading